3.1 requirements.no load test.According to the relevant provisions of the DL/T5019 check the running of machinery and electrical equipment provided, to be correct and reliable, stable operation, impact sound and no other anomalies.static loadtest.According to the construction drawings and inspection machinery and metal structure bearing capacity of the hoist.Test load rated load in turn 70%, l00% and 125%.dynamic load tests.According to the construction drawings, dynamic loading tests on the bodies to test the dynamic stiffness of the performance of the agencies and gantries.Test load rated load 100% and then 110%.Test agencies should be conducted separately, when there is a joint commissioning requirements, should be carried out according to the construction drawings and the instructions of the supervisor.Test, repeat to start, run, stop, forward, reverse motion, duration of at least 1h.Agencies should be flexible, stable and reliable work, limit switches, safety interlocks, anti-climbing device, the movements should be accurate and reliable, the parts should be free of cracks and other damage, the connection should not be loose.(3)civil works out the hoist and installation condit